# Progress — Milestone 3 Iteration 2 Forensic Audit

- Last visited: 2026-10-05T22:06:15Z
- Current status: Audit complete. Handoff report written to `c:\Projects\DSCons\.agents\teamwork\teamwork_preview_auditor_m3_iter2_1\handoff.md`. Verdict: CLEAN.
- Physical Qdrant storage verified: 476 points (27 DSCons, 449 non-DSCons, 0 obsolete UUIDs, all 768-dim float vectors).
- Live FastMCP SSE service verified: genuine JSON-RPC on port 8765.
- Test suites verified: 24/24 passed (100.0%) including architecture boundary enforcement.
