# GATE STATUS — Milestone 4 (Final QA Gate & Browser Visual Audit)

## Iteration 1
| Agent | Role | Verdict | Source |
|-------|------|---------|--------|
| worker_m4_qa | teamwork_preview_worker | DONE (379/379 pytest, 8/8 node, 66.15 FPS, 16.00 MB RAM) | handoff.md |
| reviewer_m4_1 | teamwork_preview_reviewer | APPROVE (0 violations, genuine patterns, 16.01 MB RAM, 75.6 FPS) | handoff.md |
| reviewer_m4_2 | teamwork_preview_reviewer | APPROVE (db WAL/FK verified, 360 PNGs valid, normal B>128, 399 pytests) | handoff.md |
| challenger_m4_1 | teamwork_preview_challenger | APPROVE (modal defect fixed, unobstructed textures verified, 73.68 FPS) | handoff.md |
| challenger_m4_2 | teamwork_preview_challenger | APPROVE (all tests pass, 8 slots bound, 0 canvas leaks, 16.01 MB RAM) | handoff.md |
| auditor_m4 | teamwork_preview_auditor | CLEAN (0 integrity violations, authentic algorithms, genuine assets) | handoff.md |

Gate Result: **PASS**

## Overall Project Status
- Milestone 1 (R&D & Specification: Database & Catalogs): DONE (PASS)
- Milestone 2 (Design & Asset Pipeline: 30 Styles Assets): DONE (PASS)
- Milestone 3 (Engine & Client Pipeline Integration): DONE (PASS)
- E2E Testing Track: DONE (PASS)
- Milestone 4 (Final QA Gate & Browser Visual Audit): DONE (PASS)

**ALL ACCEPTANCE CRITERIA ARE 100% SATISFIED.**
