# Progress Log — Victory Auditor 15

- Last visited: 2026-10-04T14:16:00Z
- Status: Audit Completed — Generating Final Victory Audit Report & Handoff
- Current Phase: Phase D — Report Delivery

## Phase Completion Summary
- [x] Phase A: Scope, Timeline & Provenance Audit (PASS)
  - All requirements R1-R5 of `ORIGINAL_REQUEST.md` (2026-10-04T12:05:22Z) verified
  - Authentic development timeline verified: Iteration 1 caught UV overflow, Iteration 2 remediated UV math and modularized tests
- [x] Phase B: Integrity & Forensic Anti-Tampering Check (PASS)
  - Zero facades, dummy stubs, or mock cheating detected
  - 2048x2048 PoT textures verified
  - Tangent Normal Map Blue mean = 254.69 > 128.0 verified
  - Dilation padding fringe tested: 40,501 / 40,501 (100.0%) boundary pixels retain non-zero RGB color, eliminating dark halos
  - ASTC 4x4 container: canonical Khronos header `0x13aba15c`, 4,194,320 bytes verified
  - Cocos 3.8 `SpriteAtlasRenderer.ts` zero-allocation hot paths verified
  - Monster & Character scaffolding: 4,848 animation frames across 16 manifests audited; 0 out-of-bounds UVs
- [x] Phase C: Independent Test & Engine Execution (PASS)
  - `pytest tests/e2e_cocos/test_vfx_texture_atlas_pipeline_e2e.py -v`: 19/19 PASSED (100%)
  - `pytest tests/e2e_cocos/test_vfx_scaffolding_and_parity_e2e.py -v`: 9/9 PASSED (100%)
  - `pytest tests/unit/test_asset_pipeline_tools.py -v`: 9/9 PASSED (100%)
  - `python tools/lint/check_code_and_doc_hygiene.py --strict`: 0 Hard Cap violations, exit code 0
  - `npm run build:web` in `client/cocos/`: 0 errors, exit code 0
  - Full suite `pytest tests/e2e_cocos/ -v`: 210/210 PASSED (100%)
  - Campaign suite `pytest tests/e2e/test_asset_campaign_and_pipeline_e2e.py -v`: 28/28 PASSED (100%)
  - Discrepancies with claimed scores: 0 (Exact Match)
- [x] Final Verdict: VICTORY CONFIRMED
