# Dispatch for Worker M1 (DRQ Inbox Generation)

## Task Objective
Generate and validate all 21 Design Requests (DRQ) across 6 departments into `docs/design_requests/inbox/`.

## Input Files
- `c:/Projects/FreeExile/.agents/teamwork/ORIGINAL_REQUEST.md` (specifically 2026-10-01T22:03:34Z)
- `c:/Projects/FreeExile/.agents/teamwork/explorer_survey_drq/analysis.md` (contains complete specifications for all 21 DRQs)
- `docs/design_requests/templates/DESIGN_REQUEST_TEMPLATE.md`
- `tools/asset_pipeline/design_pipeline_manager.py`

## Exclusive Write Ownership
- `docs/design_requests/inbox/DRQ-20261001-*.md` (all 21 files)

## Requirements
1. Follow the template schema with all 9 metadata keys:
   - `ID: DRQ-YYYYMMDD-[FEATURE]`
   - `Department: [Systems | Narrative & NPC | Economy | Security | Client Engine | Server & AI Agents]`
   - `Title: [Short title]`
   - `Priority: [CRITICAL | HIGH | MEDIUM | LOW]`
   - `Asset Type: [Sprite | Atlas | UI | VFX | Shader | Concept]`
   - `Target Path: client/webapp/assets/[category]/[filename]`
   - `Dimensions: [W]x[H] (Must be 2^n)`
   - `Size Budget: < [150KB | 2MB | 50KB]`
   - `Normal Map Required: [YES | NO]`
2. Provide all 21 DRQs:
   - Systems (4): SYS-PASSIVE-TREE-NODES, SYS-CRAFTING-STATION-UI, SYS-MAP-DEVICE-ARENA, SYS-HIDEOUT-SAFEHAVEN-PROPS
   - Narrative & NPC (3): NPC-FERAL-ELDERS-AVATARS, NPC-QUEST-SCROLL-VARIANTS, NPC-CUTSCENE-STORYBOARD
   - Economy (4): ECO-CURRENCY-BLOODSTONES, ECO-CRAFTING-ORBS-CATALOG, ECO-BAZAAR-TRADE-PANELS, ECO-LOOT-DROP-PARTICLES
   - Security (3): SEC-SHIELD-ACTIVE-ANIMATION, SEC-ALERT-BADGES-QUARANTINE, SEC-UI-FORENSIC-WATERMARK
   - Client Engine (4): CLI-LOADING-SCREEN-ART, CLI-LOGIN-PARALLAX-LAYERS, CLI-WORLD-BACKGROUND-LAYERS, CLI-TOUCH-CONTROLS-PROMOTION
   - Server & AI Agents (3): SRV-AGENT-ORB-ACTIVATION-VFX, SRV-HARVEST-REPORT-OVERLAY, SRV-AOI-SYNC-TELEMETRY-VISUAL
3. Run verification command:
   `python tools/asset_pipeline/design_pipeline_manager.py report`
   Confirm that all 21 DRQs are parsed and reported with valid metadata.

## Output Requirements
Write `progress.md` with timestamps and `handoff.md` in `c:/Projects/FreeExile/.agents/teamwork/worker_m1_drq/`.
Send message to parent when done.

## 2026-10-01T22:12:12Z
You are worker_m1_drq. Your working directory is:
c:/Projects/FreeExile/.agents/teamwork/worker_m1_drq/

MANDATORY: You MUST read the full user request before starting work at:
c:/Projects/FreeExile/.agents/teamwork/ORIGINAL_REQUEST.md (specifically the latest request under header '## 2026-10-01T22:03:34Z').
Also read your dispatch task at:
c:/Projects/FreeExile/.agents/teamwork/worker_m1_drq/DISPATCH.md
Also read the detailed survey specifications at:
c:/Projects/FreeExile/.agents/teamwork/explorer_survey_drq/analysis.md

MANDATORY INTEGRITY WARNING:
DO NOT CHEAT. All implementations must be genuine. DO NOT hardcode test results, create dummy/facade implementations, or circumvent the intended task. A teamwork_preview_auditor will independently verify your work. Integrity violations WILL be detected and your work WILL be rejected.

Your mission:
1. Generate all 21 DRQs across 6 departments into `docs/design_requests/inbox/` according to `explorer_survey_drq/analysis.md` and template `docs/design_requests/templates/DESIGN_REQUEST_TEMPLATE.md`.
2. Ensure each DRQ has all 9 metadata keys formatted correctly, power-of-two dimensions, and accurate priorities.
3. Run verification command:
   `python tools/asset_pipeline/design_pipeline_manager.py report`
   Confirm that all 21 DRQs are correctly parsed and listed with status.
4. Maintain `progress.md` with timestamps and produce `handoff.md` in your working directory.
5. Send a completion message back to parent with your verification results.
